How many biogas production plants are operational?

In line with the "Roadmap for biogas" set by the IDAE for 2030, which aims to multiply biogas production almost fourfold, at Nedgia we have 7 plants that are already injecting biogas into the gas grid. The Elena plant in Cerdanyola del Vallès (Barcelona) was the first to inject renewable gas from a landfill site. This initiative was followed by Biogasnalia in Burgos, with agri-industrial waste. Lleida is connected to the Torre Santamaría farm and the Vila-sana plant, which are injecting biomethane from livestock waste. In A Coruña, the Bens WWTP injects biomethane from wastewater. The company has also started to inject biomethane into the network at Els Hostalets de Pierola, which comes from urban waste from Barcelona, and Granollers WWTP, in Granollers, which uses wastewater and organic waste.